Ladysmith Phase I and II supplying enlargement
In the town of Ladysmith, KwaZulu-Natal province, were installed in 2014 around 20,000m of TOM® pipes DN630 mm at PN12.5, 16 and 25 bar pressure for the creation of a water supply network in the town.
In the town of Ladysmith, KwaZulu-Natal province, were installed in 2014 around 20,000m of TOM® pipes DN630 mm at PN12.5, 16 and 25 bar pressure for the creation of a water supply network in the town.
The Central Board of Water and Sanitation of the State as a decentralized public agency of the Government of the State of Chihuahua, within the Program of Water Supply and Sewerage in the Urban Areas 2014 Plan, through its Committee of Acquisitions, Leasing and Services, tendered the work of pipes supply for treated water, in the city of Chihuahua, Juarez.
In this project were installed more than 1,000 m TOM® PVC-O pipes DN500 mm at PN 16.
Improvement of supply to the municipality of Zarzalejo by building a new 2,000 m3 capacity reservoir in the Zarzalejo urban center to increase the supply guarantee and the connecting pipe between the two Zarzalejo reservoirs.
In the town of Matarani, Arequipa, the installation of more than 4,400 m of TOM pipes in diameters 160 and 200 mm in PN16 bar has been carried out.
Construction of the reclaimed water supply network in Valdemoro (Madrid). The works include the construction of two deposits of 1,500 and 2,000 cubic meters of capacity, three pumping groups and 46 kilometers of pipes to transport the reclaimed water to the public green areas of the town. The General System of Arroyo Culebro allows providing reclaimed water to seven municipalities in the south like Alcorcon, Fuenlabrada, Getafe, Humanes de Madrid, Leganes, Parla and Pinto.
This was a project to improve the irrigation infrastructure of the Bajo Almanzora Irrigators Community consisting in the replacement of three lines by a larger one of 630mm diameter in PVC-O material, allowing in this way the transport of water for supply and for the irrigation of the region.
The Bajo Almanzora region has an area of 1,148 km2. The Municipality of Huercal Overa is the one with the largest surface area, 318 km2, with a population of 14,672 inhabitants.
Drinking water pumping station from Uga to Lomo de Tesa, 2015 investment, executed by the Water Consortium of Lanzarote in San Bartolomé.
In this project more than 5,000m of TOM® PVC-O pipes of 315 and 500 mm diameter at pressures of 16, 20 and 25 bar were installed.
ESSAP- Empresa de Servicios Sanitarios del Paraguay S.A, guarantees the supply of drinking water for the city of San Bernardino with the purpose of supplying the demand of the service for 3,500 active users and more than 10,000 visitors.
In the Tukungua area of the city of San Bernardino, ESSAP officials are excavating to lay 3,700 meters of 250 millimeter PVC-O pipe.
This is the first installation project in India, carried out by Floking Pipes Ltd.
The Promoter (Association of 57 farmers) is engaged to do hi-tech cultivation of agricultural crops of improved variety like Grapes & Sugarcane covering 101 hectares of total land. The water need of the farmers is estimated at 0.63 LPS per hectare.
Water was lifted from river Krishna with the said 315 mm 12.5 bar PVC-O pipe line installation.
Construction of the entire recycled water distribution system to the public green areas of the municipality of Ciempozuelos from the tertiary treatment of the Soto Gutiérrez wastewater treatment plant and extracted from a storage depot in Ciempozuelos.
The distribution network consists of 12,801 m of TOM® PN16 Atm Oriented PVC pipes and is divided into five branches (DN110, DN160, DN200, DN250 and DN315 mm) extending through the urban center of Ciempozuelos.