Main line replacing at Pachuca, Hidalgo. Tuzobús project
Due to the variation of pressure in the north of the Journalists colony of the city of Pachuca (Hidalgo), the Commission of Intermunicipal
Due to the variation of pressure in the north of the Journalists colony of the city of Pachuca (Hidalgo), the Commission of Intermunicipal
Collective irrigation project involving 23 farms of "ASA of Biétre" (Association Syndicale Autorisée de la Biétre). This project is part of the closure of the sugar factory of Aiserey in the Souteast of Dijon, south of the A39 and A31 highways, of the Dijon-Bourgogne airport, and West of the l'Ouche river.
Collective irrigation project involving 23 farms of "ASA of Biétre" (Association Syndicale Autorisée de la Biétre). This project is part of the closure of the sugar factory of Aiserey in the Souteast of Dijon, south of the A39 and A31 highways, of the Dijon-Bourgogne airport, and West of the l'Ouche river.
In this project more than 16,400m of TOM® PVC-O pipes DN 200mm and DN 250mm at 16 bar pressure were installed.
In the city of Thoire sur Dinan, province of La Sarthe, there were installed around 2,300m of TOM® PVC-O pipes DN 110mm and DN 160mm at PN25 bar pressure for the creation of a water supply network in the same locality.
The implementation of the Irrigation Plan allows the irrigation of around 600 hectares of vineyards and olive land. This Plan consists of collecting water from the industrial water treatment and pumping it into a first raft from which it proceeds to the irrigation area of Jarata and pumping it again into a second raft from which the branches carry water to irrigators.
In this project more than 20,200 m of TOM® PVC-O pipes DN100 mm to DN315 mm at pressures of 16, 20 and 25 bar were installed.
Trasformation works to improve the distribution network in which a project of special scale has been performed in the municipality of Lanciego (Álava), in an area of 800 hectares.
In this project more than 60,000m of TOM® PVC-O pipes DN110 mm to DN250 mm were installed at pressures of 12.5 and 16 bar.
The sanitation project in the cities of Brazzaville and Pointe Noire intervenes in the two main cities of Congo for a total of approximately 48.7% of the population. Among the main results of the project at the end of the 48 months provided for its implementation are: 12 Kms of sewage rainwater drainage system in Pointe Noire; and an institutional study of the consolidation strategy in the subsector.
Here more than 15,000 meters of TOM® PVC-O pipes, 110-315 mm diameter at 12.5 and 16 bar pressure have been projected.
This project is included within the action carried out in the Madrid Depura Plan which aims to preserve the available water resources with the reuse of treated water to water with recycled water all the green areas of the city, wich exceed 232 hectares, to these must be added the 80 hectares of the Humedal Park. Keeping this surface is a daily consumption of 4,000 cubic meters of water.
In this project more than 14,600m of TOM® PVC-O pipes of DN 200, 250, 315, 400 and 500mm at 12.5 bar pressure were installed.